| Paper No. |
Author |
Paper Title |
| PICM05-0046 |
Youngki HUH |
CREW PRODUCTION RATES FOR CONTRACT TIME ESTIMATION: BENT FOOTING AND COLUMN OF H... |
| PICM05-0047 |
Tzu-Ping LO |
DESIGN GUIDELINE FOR BIOSAFETY LABORATORY CONSTRUCTION |
| PICM05-0048 |
Jin-Lee KIM |
DEVELOPMENT OF A TIME-COST TRADE-OFF MODEL USING OPTIMIZATION |
| PICM05-0049 |
Jin-Lee KIM |
DERIVING ACCURATE COST CONTINGENCY ESTIMATE FOR MULTIPLE PROJECT MANAGEMENT |
| PICM05-0050 |
Kumar VELLANKI |
THE ROLE OF INFORMATION TECHNOLOGY FOR CONTRACTOR PREQUALIFICATION |
| PICM05-0051 |
Fwu-shiun LIOU |
A STUDY ON THE PROMOTION OF COMMON UTILITY DUCTS IN TAIWAM |
| PICM05-0052 |
Charles Y.J. CHEAH |
ANALYSIS OF STRATEGIC PERFORMANCE OF LARGE ENGINEERING AND CONSTRUCTION FIRMS |
| PICM05-0053 |
Nirmal Kumar ACHARYA |
TEN MANAGEMENT STRATEGIES TO AVOID CONSTRUCTION CONFLICTS |
| PICM05-0054 |
Wen-Der YU |
PERFORMANCE EVALUATION OF THE CONSTRUCTION KNOWLEDGE MANAGEMENT SYSTEM—A C... |
| PICM05-0055 |
Shu-Shun LIU |
FLEXIBLE OPTIMIZATION MODEL FOR LINEAR SCHEDULING PROBLEMS |
| PICM05-0056 |
Jae-Ho PYEON |
SCHEMATIC APPROACH TO IMPROVE TIME PERFORMANCE OF HIGHWAY CONSTRUCTION CONTRACTS |
| PICM05-0057 |
Nai-hsin PAN |
THE RESEARCH OF CONSTRUCTION PROJECT MATERIALS REQUIREMENT SYSTEM |
| PICM05-0058 |
Eul-Bum LEE |
INNOVATION AND TECHNOLOGIES FOR ACCELERATED HIGHWAY REHABILITATION PROJECTS: CA4... |
| PICM05-0059 |
Takashi KANETA |
COMPARATIVE STUDY ON INTER-ORGANIZATIONAL RELATIONSHIPS BETWEEN KEIRETSU AND PAR... |
| PICM05-0060 |
Yongseok JEON |
A CONSTRUCTION PROCESS MODEL USING CONSTRUCTION FAILURE INFORMATION |