| Paper No. |
Author |
Paper Title |
| PICM05-0016 |
Chun-Nen HUANG |
ESTABLISH AN ASSESSMENT MODEL OF PUBLIC CONSTRUCTION QUALITY INDEX FROM THE VIEW... |
| PICM05-0017 |
Weijun LIU |
SIMULATION ARROW DIAGRAMMING METHOD FOR SCHEDULING HIGHWAY ENGINEERING WITH THE ... |
| PICM05-0018 |
Weijun LIU |
HIGHWAY ENGINEERING TIME MANAGEMENT SYSTEM BASED ON TOTAL TIME MANAGEMENT |
| PICM05-0019 |
Weijun LIU |
SIMULATION EVALUATING THE SCHEDULE CONSTRUCTABILITY OF HIGHWAY ENGINEERING |
| PICM05-0020 |
Yungchia CHENG |
THE ANALYSIS OF COMPONENT FOR CONSTRUCTION MANAGEMENT |
| PICM05-0021 |
Jin-Fang SHR |
BEST TIMING OF GOVERNMENT¡¯S TERMINATION ON FREEWAY RECONSTRUCTION CONTRACT |
| PICM05-0022 |
Youngsoo JUNG |
MEASUREMENT METHODOLOGIES FOR INFORMATIZATION IN CONSTRUCTION |
| PICM05-0023 |
Shigang YAN |
ANALYSIS OF COMPETITIVE ADVANTAGE ON SMALL AND MEDIUM-SIZED ENTERPRISE IN CHINA |
| PICM05-0024 |
Jianbo YUAN |
SIMULATION ARROW DIAGRAMMING METHOD FOR SCHEDULING HIGHWAY ENGINEERING WITH THE ... |
| PICM05-0025 |
Sung Wook CHOI |
THE PROPOSAL OF OPTIMAL CONSTRUCTABILITY EVALUATION FACTS IN THE BASIC STEP FOR ... |
| PICM05-0026 |
Fiona CHEUNG |
RELATIONAL CONTRACTING: THE WAY FORWARD OR JUST A BRAND NAME? |
| PICM05-0027 |
Shen CAO |
RESEARCH ON LOAD-BEARING PROPERTY AND DESIGN OF CABLE DOMES |
| PICM05-0028 |
Eva C. W. SUNG |
THE FUNDAMENTAL PRINCIPLES OF BOT CONTRACT DESIGN |
| PICM05-0029 |
Muhammad Imran GHATALA |
A SIMULATION APPROACH FOR CONSTRUCTION MANAGEMENT EDUCATION |
| PICM05-0030 |
Yan-Chyuan SHIAU |
THE INVESTIGATION OF PROPERTY MANAGEMENT AND THE DEVELOPMENT OF ¡®BUILDING ADMINI... |